Mack Engineering

Sanitary Sewer vs. Septic for Rural North Georgia Subdivisions

Sanitary Sewer vs. Septic for Rural North Georgia Subdivisions On a rural North Georgia subdivision, the single most consequential design decision is whether the lots will be served by public sanitary sewer or by individual on-site septic systems. The decision drives lot size, total lot count, infrastructure cost, permit timeline, soil testing requirements, and ultimately…

READ MORE: Sanitary Sewer vs. Septic for Rural North Georgia Subdivisions

Choosing Between a Local Civil Engineer and a National Firm for Your Atlanta Development

Choosing Between a Local Civil Engineer and a National Firm for Your Atlanta Development When a developer, builder, or property owner in Metro Atlanta lines up the engineering team for a site, the choice usually comes down to two profiles: a large national or regional multi-disciplinary firm with hundreds of staff and offices in every…

READ MORE: Choosing Between a Local Civil Engineer and a National Firm for Your Atlanta Development

Pickleball Court Site Design: Setbacks, Drainage, Parking, and Permits

Pickleball Court Site Design: Setbacks, Drainage, Parking, and Permits Pickleball is the fastest-growing sport in the United States, and the construction pipeline behind it has shifted from one-court conversions of tennis courts into purpose-built multi-court commercial facilities. We have designed pickleball facilities including the Pickleball Kingdom project in Athens, and the civil engineering decisions on…

READ MORE: Pickleball Court Site Design: Setbacks, Drainage, Parking, and Permits

Medical Office Site Development in North Georgia: A Permit-to-CO Timeline

Medical Office Site Development in North Georgia: A Permit-to-CO Timeline A medical office building (MOB) is not a normal office. The parking demand is higher, the ADA requirements are stricter, the inspection sequence is longer, and depending on what services the tenant provides, the building may trigger plan review by the Georgia Department of Community…

READ MORE: Medical Office Site Development in North Georgia: A Permit-to-CO Timeline

Stormwater Fee Reduction Studies: How to Lower Your Atlanta-Area Property’s Stormwater Bill

Stormwater Fee Reduction Studies: How to Lower Your Atlanta-Area Property’s Stormwater Bill Most commercial property owners in the Atlanta region pay a monthly or annual stormwater utility fee on top of their other property taxes and utilities. The fees are calculated based on the amount of impervious surface — rooftops, parking lots, driveways — and…

READ MORE: Stormwater Fee Reduction Studies: How to Lower Your Atlanta-Area Property’s Stormwater Bill

Georgia NPDES Construction Stormwater Permits: 2023 Reissuance and What’s Changed Through 2028

Georgia NPDES Construction Stormwater Permits: 2023 Reissuance and What’s Changed Through 2028 On August 23, 2024 — after a year-long legal challenge — the Georgia Environmental Protection Division reissued the three NPDES construction stormwater general permits (GAR100001, GAR100002, and GAR100003) that authorize stormwater discharges from construction activities to waters of the State of Georgia. The reissued permits…

READ MORE: Georgia NPDES Construction Stormwater Permits: 2023 Reissuance and What’s Changed Through 2028

Milton GA Subdivision Rules: Splitting Land Under the Unified Development Code

Milton GA Subdivision Rules: A 2026 Guide to Splitting Land Under the Unified Development Code Milton, Georgia is one of the most desirable — and most regulated — residential markets in Metro Atlanta. If you are thinking about splitting a parcel, developing a small subdivision, or buying land in Milton with the intent to subdivide…

READ MORE: Milton GA Subdivision Rules: Splitting Land Under the Unified Development Code