Foundation and Framing Plans for New Homes and Renovations in Milton, Alpharetta, Sandy Springs and Roswell

What structural plans do you need to build or renovate a home in North Atlanta? Milton, Alpharetta, Sandy Springs and Roswell all expect the permit drawings for a new home or a structural renovation to include a dimensioned foundation plan with footing and reinforcing details, and framing plans showing the size, spacing and location of joists, rafters, beams, headers and posts[3][6][7][11]. Under the 2024 International Residential Code, any structural element that goes beyond the code’s prescriptive limits must be designed in accordance with accepted engineering practice[1]. Milton asks for engineer design or calculations for those elements[3], and Roswell requires them to be prepared and sealed by a Georgia-licensed design professional[11].

Key Takeaways

  • All four cities review structure at permit. Foundation plans and framing plans are standard parts of a residential submittal[3][6][7][11].
  • Prescriptive limits are the line. When a beam, span, wall height or connection goes beyond what the IRC covers, it needs an engineered design[1].
  • Milton: foundation plan, braced wall lines, full framing plans and connection details, plus engineer design for non-prescriptive elements[3].
  • Alpharetta: dimensioned foundation plan, bearing wall and framing details, and truss drawings reviewed before the framing inspection[6].
  • Sandy Springs: foundation and framing plans and details plus truss drawings; a registered design professional may be required for wall removals, new column loads, second-story additions and complex framing[7][8].
  • Roswell: stated soil bearing capacity, framing plans with a lumber schedule, a wall bracing plan, and sealed design for anything beyond prescriptive limits[11].
  • Structure is cheapest on paper. Spans, beam sizes and bearing lines settled with the builder before permitting cost far less than field fixes, revisions and re-inspections.

What Foundation Plans and Framing Plans Actually Do

Architectural plans show what a house looks like. Structural plans show how it stands up. Together, the foundation plan and framing plans trace every load, from the roof down through rafters or trusses, walls, beams, posts and floor joists, into footings sized for the soil below.

Foundation plan

A foundation plan locates and dimensions every footing under exterior walls, interior bearing walls and posts, and details footings, foundation walls and slabs with their reinforcing steel[6]. Roswell also asks for the assumed soil bearing capacity to be stated, and for foundation wall height and unbalanced backfill to be within prescriptive limits or engineered[11]. That matters on the sloped lots and basement homes common across North Fulton.

Framing plans

Framing plans are top-down views of each floor and the roof. They show joist and rafter size, spacing and direction, every beam and header, posts, and the braced wall lines that resist wind[3][11]. Roswell asks for the bearing conditions at both ends of every beam, girder and header, including jack and king stud counts and the continuous load path down to the footing[11].

When a design goes beyond the IRC’s prescriptive tables, the code requires those elements to be designed in accordance with accepted engineering practice, and the design must work with the rest of the conventionally framed house[1]. If you are not sure whether your project needs a structural or a civil engineer, our guide to structural vs. civil engineers in Georgia explains the difference.

Watercolor presentation foundation plan for a new home showing continuous footings, interior pier footings and a footing section detail
A foundation plan locates every footing and pier under the house. Illustration.

Structural Plan Requirements by City

CityFoundation planFraming plansWhen engineering is called out
MiltonFoundation plan with footing sizes and rebar details[3]All structural members on floor, ceiling and roof plans; braced wall lines per IRC R602.10 with portal frame details; post, beam, rafter and ledger connections[3]Engineer design or calcs for any element not prescriptively detailed in the IRC[3]
AlpharettaDimensioned footings at foundation walls, exterior walls and interior bearing walls; footing, wall and slab details with reinforcing[6]Bearing wall stud size and spacing, anchorage, floor and roof framing size and spacing, post and column details; truss supplier drawings[6]Structural change details for any change to floors, bearing walls or roof in remodels; sealed bracing plan when structure is disturbed during demolition[6]
Sandy SpringsFoundation plans and details[7]Framing plans and details, truss drawings[7]; braced wall lines, bracing methods and hold-downs identified[8]Registered design professional where required: removing walls, new column loads, second floor additions, verifying existing foundations, complex framing[8]
RoswellFooting width and depth at bearing walls, assumed soil bearing capacity, foundation cross-section[11]Floor and roof framing plans, lumber schedule with species and grade, beam bearing details, wall bracing plan[11]Sealed drawings and calcs for anything beyond IRC prescriptive limits, engineered wood products and new-to-existing foundation connections[11]

Roswell items above come from the city’s residential addition checklist. Requirements change, so confirm the current checklist with the city before you submit. This table reflects city documents available in November 2026.

What Each City Looks For

City of Milton

Milton enforces the 2024 International Residential Code with Georgia amendments[2]. Its new construction checklist asks for a foundation plan with footing sizes and reinforcing, compliant braced wall lines under IRC R602.10 with portal frame details where a wall line falls short, and framing plans showing every post, beam, joist, rafter, stair and guard on the floor, ceiling and roof. It also asks for post-to-footing, post-to-beam, rafter and ledger connection details, and engineer design or calculations for any element the IRC does not cover prescriptively[3]. Additions follow a similar checklist[4]. Milton issues approval or revision comments within 10 business days of accepting a permit for review[5], and it warns that building differently from approved plans can mean failed inspections, resubmittals and added engineering costs[2]. See our civil engineering services in Milton.

City of Alpharetta

Alpharetta requires a dimensioned foundation plan showing footings at foundation walls, exterior walls and interior bearing walls, with details of footings, foundation walls and slabs including reinforcing steel. Framing information must list stud size and spacing in bearing walls, show how bearing walls anchor to the foundation, and give the type, size and spacing of joists and rafters. Posts and columns supporting floors or roofs need size, anchoring and connection details. If manufactured trusses are used, the supplier’s drawings must be reviewed by city plan reviewers before the framing inspection[6].

For remodels, Alpharetta asks for structural change details for any change to floors, bearing walls or the roof. When existing structure is disturbed during demolition, a professionally sealed structural bracing plan is required. Any change from the approved plans must be submitted as a revision and reviewed before the change is built[6]. See our civil engineering services in Alpharetta.

City of Sandy Springs

Sandy Springs lists foundation plans and details, framing plans and details, and truss drawings as typical structural drawings for a single-family house permit[7]. The city’s code seminar states that braced wall lines, bracing methods, panel lengths and hold-down requirements must be shown on the drawings. It also states that the building official can require a registered design professional when walls are removed, new column loads are added to an existing structure, a second floor is added over an existing floor, the existing foundation must be checked for new loads, or the framing is complex, such as large spans and cantilevers[8].

Foundation dimensions, reinforcement and embeds must be inspected before concrete is placed, and foundation wall reinforcement must be inspected before it is enclosed[9]. Revised drawings after permit go through the same review as the original submittal[10]. For more on Sandy Springs permitting, read our Sandy Springs residential LDP questions and answers.

City of Roswell

Roswell’s residential addition checklist is one of the most detailed in the area. It requires a foundation plan with footing width and depth at every bearing wall and the assumed soil bearing capacity, floor and roof framing plans, a complete lumber schedule with species and grade, bearing details at both ends of every beam and header, and a wall bracing plan. If any structural element exceeds the IRC’s prescriptive provisions, the drawings and calculations must be prepared and sealed by a Georgia-licensed design professional. Engineered wood layouts such as LVLs, trusses and I-joists must be certified and sealed, and connecting a new foundation to an existing one needs a stamped engineer’s detail[11].

New single-family homes in Roswell also need a land development permit issued, and the initial erosion control inspection approved, before the building permit is issued[12]. Stamped approved plans must be on the job site for inspections[13]. See our civil engineering services in Roswell.

Presentation floor framing plan for a new single-family home showing joists, beams, posts and a stair opening with soft watercolor tints
A floor framing plan shows every joist, beam and post on one sheet. Illustration.

New Construction vs. Renovations: Where Structure Gets Tricky

New homeRenovation or addition
Starting pointClean slate: architectural plans, soil and site gradingAn existing structure with unknown sizes, spans and footings
Common structural itemsLong spans, open plans, two-story great rooms, tall walls, basement walls on sloped lots, engineered beams and trussesRemoving bearing walls, adding a second story, new beams and posts, tying new footings into old ones
What the city focuses onComplete foundation and framing plans, bracing and connections[3]Structural change details, existing foundation capacity, new-to-existing connections[6][8][11]
Where cost hidesOversized members from conservative guesses, and steel where wood would workSurprises behind drywall found after demolition

Renovations add one step that new homes skip: finding out what is already there. We verify existing framing and bearing points before designing new beams, posts and footings, so the plans reflect the house that exists, not the one on an old drawing. Our post on structural engineering for residential renovations goes deeper on remodels.

Renovated open kitchen and living room where a load-bearing wall was replaced by a new beam supported on posts
Opening a kitchen to the living room means a new beam, new posts and a path to the footings. Illustration.

  • We help standardize foundation and framing details across a community’s plan set so each lot is not a new design.
  • We tie the structure to the site plan, grading and basement conditions on each lot, which change footing and foundation wall design on sloped North Fulton sites.
  • Homeowners

    • We explain what the city needs and why, in plain language, and what each structural choice costs.
    • We work with your architect or designer and your builder so you are not stuck relaying questions between them.

    Modeled in Revit

    We model the structure in Revit so beams, joists, ductwork, plumbing and stairs can be checked against each other before anything is built. Conflicts get solved on screen, not with a saw on site. See our Revit modeling and BIM coordination services.

    3D structural framing model of a two-story home showing studs, floor joists, engineered beams and roof trusses on a monitor
    A 3D framing model lets the builder see every beam and joist before framing starts. Illustration.

    How Thoughtful Structural Design Keeps a New Home on Budget

    Cost-effective structure is not about the cheapest member on each line. It is about the fewest surprises from permit to final. These are the decisions that move cost the most:

    • Line up bearing walls. Stacking walls and posts floor to floor lets loads travel straight down, which shrinks beams and footings.
    • Size members to the real load. Engineered sizing avoids both undersized members that fail inspection and oversized members that waste money.
    • Choose wood before steel where it works. Engineered lumber often handles spans that would otherwise trigger steel and the crane and fabrication that come with it.
    • Get bracing right the first time. Milton and Sandy Springs both expect braced wall lines on the drawings[3][8]; open floor plans with large windows often need portal frames or engineered shear walls, which are easier to plan than to retrofit.
    • Design footings for the soil and slope. Footings and basement walls sized for the actual lot avoid both overdesign and costly field changes when excavation reveals different conditions.
    • Submit a complete package. Cities review revisions the same way as original submittals[6][10], so a complete, coordinated set avoids extra review cycles and idle crews.

    Our Foundation and Framing Plan Process

    • 1. Review: architectural plans, site and grading, soil information, and for renovations, a site visit to verify existing structure.
    • 2. Structural layout: bearing lines, beam and post locations, floor and roof systems, and braced wall lines.
    • 3. Coordinate: with the builder, framer and truss or engineered lumber supplier, and in the Revit model.
    • 4. Design and seal: foundation plan, framing plans, details and calculations, sealed by a Georgia-registered Professional Engineer when required.
    • 5. Permit: a complete structural set formatted to the city’s checklist, with responses to plan review comments.
    • 6. Construction support: field questions, revisions and site observation when needed. Learn more about our construction management support.

    Talk to a Structural Engineer in North Atlanta

    Mack Engineering prepares foundation and framing plans from our office in Alpharetta for general contractors, builders, developers and homeowners in Milton, Alpharetta, Sandy Springs, Roswell and across Metro Atlanta. Send us your architectural plans and tell us about the project. We will tell you what the city will require and how to get there efficiently. Contact Mack Engineering or call (770) 715-7295.

    Frequently Asked Questions

    Do I need a structural engineer for a new house in North Fulton?

    Every new house needs foundation and framing information on the permit drawings. Under the International Residential Code, any structural element that goes beyond the code’s prescriptive limits must be designed by engineering. Milton and Roswell checklists call for engineer design or sealed drawings for those elements, and most custom homes with long spans, large openings, tall walls or engineered beams have at least some.

    What does a foundation plan show?

    A foundation plan shows the location and size of every footing under exterior walls, interior bearing walls and posts, plus details of footings, foundation walls and slabs with reinforcing steel. Alpharetta and Milton both list these items on their residential checklists, and Roswell asks for the assumed soil bearing capacity to be stated.

    What does a framing plan show?

    A framing plan is a top-down view of the structure for each floor and the roof. It shows the size, spacing and direction of joists and rafters, the location and size of every beam and header, posts, braced wall lines, and how loads travel down to the foundation.

    Do I need an engineer to remove a load-bearing wall?

    Usually. Removing a bearing wall means a new beam, new posts and new loads on the foundation. Sandy Springs lists removing walls and adding new column loads among the cases where it can require a registered design professional, and Roswell requires sealed design when load-bearing elements are modified beyond prescriptive limits.

    Are truss and LVL drawings enough on their own?

    No. Manufacturer truss and engineered lumber drawings design those individual members. The framing plan still has to show how they bear, what supports them, and how their loads reach the footings. Alpharetta requires truss drawings to be reviewed before the framing inspection, and Roswell asks for engineered wood layouts certified by a Georgia-licensed design professional.

    Do you work with my builder or general contractor?

    Yes. Mack Engineering prepares foundation and framing plans for general contractors, builders, developers and homeowners, and coordinates directly with the builder, the framer and the truss supplier so the plans match how the house will actually be built.

    Sources

    [1] International Code Council, 2024 International Residential Code, Chapter 3, Section R301.1.3 Engineered Design. https://codes.iccsafe.org/content/IRC2024V1.0/chapter-3-building-planning

    [2] City of Milton, Building (adopted codes). https://www.miltonga.gov/government/community-development/building

    [3] City of Milton, Residential New Construction Application Checklist (2024 IRC). https://www.miltonga.gov/home/showpublisheddocument/9159/639113504197870000

    [4] City of Milton, Residential Addition Application Checklist (2024 IRC). https://www.miltonga.gov/home/showpublisheddocument/9155/639113504190800000

    [5] City of Milton, Residential Building. https://www.miltonga.gov/government/community-development/building/residential

    [6] City of Alpharetta, Residential Building Permitting Procedures. https://www.alpharetta.ga.us/docs/default-source/community-dev/buildings-inspections/residential-building-permitting-procedures.pdf?sfvrsn=6

    [7] City of Sandy Springs, Residential Building Permits. https://www.sandyspringsga.gov/residential-building-permits/

    [8] City of Sandy Springs, Build Seminar: 2018 International Residential Code Changes. https://up.sandyspringsga.gov/sites/default/files/2022-03/Build%20Seminars%20-%202018%20International%20Residential%20Code%20Changes.pdf

    [9] City of Sandy Springs, Residential Inspections. https://up.sandyspringsga.gov/sites/default/files/2022-07/Residential%20Inspections%20-%2004-07-20.pdf

    [10] City of Sandy Springs, Permitting Process. https://www.sandyspringsga.gov/permitting-process/

    [11] City of Roswell, Residential Building Addition Plan Review Checklist. https://www.roswellgov.com/wp-content/uploads/Residential-Building-Addition-Plan-Review-Checklist.pdf

    [12] City of Roswell, Building Applications Work Classes Glossary. https://www.roswellgov.com/wp-content/uploads/Building-Applications-Work-Classes-Glossary.pdf

    [13] City of Roswell, Building (Community Development). https://www.roswellgov.com/government/departments-division/community-development/building/